Slide background
Slide background

Journals come in both print and online editions. You can submit your articles by any one of the following three methods: 1. You can send the full papers/articles directly to our gmail id: [email protected] (Or) 2.Register/Login to Submit/Browse Journal & Events Listings with full control (Or) 3. Submit papers/articles without registration by clicking here.
For any assistance, please call/whatsapp us over our mobile numbers: +919245777148 / +919486068813

APPLICATION OF CRITICAL PATH METHOD IN GARMENT UNIT FOR EFFECTIVE PRODUCTION SYSTEM (pages 77-85) by Dr. D. Chidambaram, Ph. D. in THE INTERNATIONAL MANAGER / ISSN: 2348-9413 (Online); 2348-9405 (Print)

Hot
DD Updated
 
3.3
 
3.6 (1)
1277 0 0 0 1 0

Journals

Please Login
To view the complete details of the Journal, please login.
Publication Year

In India, garment Industries present major contribution to economic development. Different garments produced in the industries are shirt, pant, chudidar, Nighty etc, for men, women and children. The stitching sequence for the garments varies from industry to industry. In this research, we have surveyed different garment industries to study the sequences followed in making the garments. Further CPM analysis was carried out to arrive at the effective production system. This helped the industries in arriving at maximising their productivity.In India, garment Industries present major contribution to economic development. Different garments produced in the industries are shirt, pant, chudidar, Nighty etc, for men, women and children. The stitching sequence for the garments varies from industry to industry. In this research, we have surveyed different garment industries to study the sequences followed in making the garments. Further CPM analysis was carried out to arrive at the effective production system. This helped the industries in arriving at maximising their productivity.

Key-words: garment Industries, economic development, garment industries, CPM analysis, productivity etc.

Editor reviews

1 reviews

Reviewed by Editorial Board
Overall rating 
 
3.3
Expertise 
 
3.0
Relevancy 
 
3.0
Presentation 
 
4.0
Fulfills All Criteria
Comments (0) | Was this review helpful to you? 0 0

User reviews

1 reviews

Overall rating 
 
3.6
Expertise 
 
3.0  (1)
Relevancy 
 
4.0  (1)
Presentation 
 
4.0  (1)
To write a review please register or
Reviewed by me
Overall rating 
 
3.6
Expertise 
 
3.0
Relevancy 
 
4.0
Presentation 
 
4.0
Let me know further
DD
Report this review Comments (0) | Was this review helpful to you? 0 0
 
     
Forgot Login?   Sign up  

Choose Archives

advertise with us 1